2009

2010

P1: RO-14-ITIM grid site maintenance; Feasibility study for Tilecal minidrawers construction;

P2: Tridimensional visualization for real-time monitoring of the ATLAS-TDAQ network; construction of a tridimensional network.

P1: RO-14-ITIM grid site maintenance; Comparative analysis for the upgrade of the drawer frontend electronics;

P2: Tridimensional visualization for real-time monitoring of the ATLAS-TDAQ network; aggregation and visualization of the traffic statistics and network equipments status.

2011